Preparation of Technical proposal for the Biomining of Legacy Waste Management with different Municipal Corporations in association with Contracting Agency.
Preparation of Tender documents for Municipal Corporations of Biomining of Legacy Waste management in association with Contracting Agency.
Preparation of Tender documents and technical proposal for Construction and Demolition Waste management plant of Municipal corporations Contracting Agency.
Correspondence, Coordination, reporting, visits, meetings, etc. with different authorities such as Officials of Municipal Corporations, Hon’ble Commissioners, Hon’ble Mayor, Counsellors, MLA, Hon’ble Minister of Solid Waste Management Department, Hon’ble Director of Swachh Bharat Mission, Hon’ble Principal Secretary of Urban Development Department, Director of State Urban Development Authorities, Hon’ble Ministers of State level and Central level, Hon’ble Justice of National Green Tribunal, Hon’ble High Court Justice, Senior Councils of High Court, Junior Councils of High Court, ACP of Traffic Department, Joint Commissioner of Police, etc. and other Administrative representative authorities.
Preparation of all consultancy / turnkey offers for engineering projects as per design requirements.
Preparation of all consultancy / turnkey offers for engineering projects as per design requirements.
Preparation of Detailed Project Report for Sewerage Network, Sewerage Treatment Plants, Consultancy services.
Preparation of Detailed Estimate for Pumping Station (Sewerage), Pipelines, Effluent Treatment Plants for various Government Bodies & Industries.
Preparation of Tender documents for various Government Bodies & Industries.
Participating in tenders and preparation of bidding documents through online/offline.
Design of Effluent, sewage and water treatment plants.
Preparation of all consultancy / turnkey offers for engineering projects as per design requirements.
Carrying out detailed engineering works.
Checking and approving civil and structural drawings.
Handling of Turnkey Projects. i.e. preparation & checking of GA & structural drawings; Preparation of work orders, procurement and supply of equipment for Turnkey Projects; preparation of operation maintenance manuals.
Some of Projects has been involved which include Trunkey Offers, Detailed Engineering, Design etc.
Analysis of CETP effluent and treating with different oxidation process using different electrode.
Worked on COD and Ammonical Nitrogen removal from CETP effluent using geotextile filters along with oxidations
Anaerobic Treatment for CETP effluent using Sludge of CETP and developed reactor.
Sludge treatment for CETP effluent using bag filters.
Combinations of different treatment for CETP effluent for COD reduction.
Treatment for pesticide effluent using Electrochemical Oxidation Process with the application of Boron Doped Diamond and Graphite Electrode.
Anaerobic Treatment for pesticide effluent.
Construction and Up-gradation of Effluent Treatment Plant by installing 1 MLD UASB reactors.
Checking drawings for GA drawings, Hydraulic Drawings, P & I drawings, Electrical details, Structural Details (SLD), etc.
Site visit / inspection / execution of work as per drawings and design.
Checking Civil work/ levels/ hydraulic at site.
Hydraulic test / water run conducted after completion of installations all electro-mechanical work equipment.
Documentation work / hand over after commissioning of Plant.
Consent Application for clearance by XGN online software of Gujarat Pollution Control Board.
Controlling concrete quality at different sites.
Providing cube casting services and giving concrete mix design.
Handling Concrete testing laboratory.
Preparing Daily report, Monthly report etc.
Site visit and Survey work, Conducting Meeting with Chairman / Director / Executive Engineer and making work progress presentation every 15 days/ during visit.
Planning for establishment of biomining treatment plant facility including all components such as Compost shed, Electrifications works, Waste stabilizations, Utilities, Fire Hydrant system, SCADA Base system etc.
Procurement of Machineries for the Solid Waste Processing plant and allied machineries, Preparation of Comparison sheet, Checking Detailed Specifications, etc.
Correspondence with different machineries service provides and routine operation checks.
Trouble shooting activities carried out on sites for the progress of works and expediating along with training and system developments.
Site visit and Survey work, Conducting Meeting with Chairman / Director / Executive Engineer and making work progress presentation every 15 days/ during visit.
Planning for establishment of biomining treatment plant facility including all components such as Compost shed, Electrifications works, Waste stabilizations, Utilities, Fire Hydrant system, SCADA Base system etc.
Procurement of Machineries for the Solid Waste Processing plant and allied machineries, Preparation of Comparison sheet, Checking Detailed Specifications, etc.
Correspondence with different machineries service provides and routine operation checks.
Trouble shooting activities carried out on sites for the progress of works and expediating along with training and system developments.
Preparation of documents for Section 9 filing under the High Court of Calcutta, Preparation of documents for Arbitration for claim filing, proceedings of High Court of Calcutta. Etc.
Site visit and Survey work, Conducting Meeting with Chairman / Director / Executive Engineer and making work progress presentation every 15 days/ during visit.
Planning for establishment of biomining treatment plant facility including all components such as Compost shed, Electrifications works, Waste stabilizations, Utilities, Fire Hydrant system, SCADA Base system etc.
Procurement of Machineries for the Solid Waste Processing plant and allied machineries, Preparation of Comparison sheet, Checking Detailed Specifications, etc.
Correspondence with different machineries service provides and routine operation checks.
Trouble shooting activities carried out on sites for the progress of works and expediating along with training and system developments.
Site visit and Survey work for existing sewerage network, water supply line, and other utilities, etc. Conducting Meeting with Chairman / Director / Executive Engineer and making work progress presentation every 15 days/ during visit.
Preparation of Alternate route for sewerage system in IIT, Madras campus.
Designing of Sewerage Network Design after conducting topographical survey work for upgradation of existing sewerage network.
Design Calculations & getting approved (vetted) from competent authority of IIT, Madras campus.
Preparation of detailed Bill of Quantity (BOQ) & getting approved (vetted) from competent authority of IIT, Madras.
Preparation of L-Sections for Sewerage Network.
Preparation of Detailed Project Report for tendering purpose.
Checking drawings for Precast Manhole, RCC Manhole, Drop Manhole, L-Sections, Steel Details, Ventilating Column, Flushing drawing, Pipe bedding of different diameters drawing, etc.
Documentations work of approved sewerage network design, drawings, and supporting all documents for final submission.
Checking Contractors documents such as Agreement, JV Partner Details, GST Number, Labour Licence, Insurance policy, Driver / operator details licences, vehicle / equipment documents such as Registration details, Insurance details, Road tax etc.
Checking Contractors bar-chart and preparations of daily activities chart also updating bar-chart monthly.
Checking quality control policy, safety policy, test frequency of all natural materials and materials as per tender terms and conditions.
Conducted GPS based survey work of existing dumped solid waste and volume calculations done by software.
Planning/reviewing execution drawings which has been provided by design consultant also suggesting changes as per site situations and conditions.
Checking levels on site, measurements, steel checking, storm water drainage checking, drawing checking for running bills etc.
Preparations of daily report, weekly report, monthly reports, minutes of meeting during review meeting.
Preparations of Running Bill for contractor as per format provided by SMC and certifying the quantity along with all documentations such as test results, challans, volume calculations sheets.
Conducting review meeting every fortnight along with City Engineer, Executive Engineer, Deputy Engineer, Assistant Engineer of Surat Municipal Corporation.
Correspondence with Surat Municipal Corporation, Third party Inspection for documentations work.
Maintaining registers of materials incoming, test conducted, material used, challans of natural resources along with royalty etc. as per tender terms and conditions.
Conducting material test inspections and getting it approved from Third Party Inspection as per tender terms and conditions.
Checking Contractors documents such as Agreement, JV Partner Details, GST Number, Labour Licence, Insurance policy, Driver / operator details licences, vehicle / equipment documents such as Registration details, Insurance details, Road tax etc.
Checking Contractors bar-chart and preparations of daily activities chart also updating bar-chart monthly.
Checking quality control policy, safety policy, test frequency of all natural materials and materials as per tender terms and conditions.
Conducted GPS based survey work of existing dumped solid waste and volume calculations done by software.
Planning/reviewing execution drawings which has been provided by design consultant also suggesting changes as per site situations and conditions.
Checking levels on site, measurements, steel checking, storm water drainage checking, drawing checking for running bills etc.
Preparations of daily report, weekly report, monthly reports, minutes of meeting during review meeting.
Preparations of Running Bill for contractor as per format provided by SMC and certifying the quantity along with all documentations such as test results, challans, volume calculations sheets.
Conducting review meeting every fortnight along with City Engineer, Executive Engineer, Deputy Engineer, Assistant Engineer of Surat Municipal Corporation.
Correspondence with Surat Municipal Corporation, Third party Inspection for documentations work.
Maintaining registers of materials incoming, test conducted, material used, challans of natural resources along with royalty etc. as per tender terms and conditions.
Conducting material test inspections and getting it approved from Third Party Inspection as per tender terms and conditions.
Site visit and Survey work for existing sewerage network, water supply line, and other utilities, etc. Conducting Meeting with Plant Head / EHS Head / Assistant Engineer and making work progress presentation every 15 days/ during visit.
Collecting Samples of Sewerage and analysis carried out for proper mitigation measures.
Designing of Sewerage Treatment Plant after conducting survey work of existing topography along with populations and calculating sewerage generations.
Finalizing locations of sewerage treatment plant, sizing of units, etc.
Up-gradations of existing Sewerage treatment plant as per populations and sewerage generation.
Designing of sewerage pumping stations and finalizing the locations. Design Calculations & getting approved (vetted) from competent authority.
Preparations of Detailed Bill of Quantity (BOQ) for sewerage system along with sewerage pumping stations.
Preparations of Detailed Project Report (DPR) for sewerage system along with sewerage pumping stations.
Preparations of Tender documents along with detailed specifications and with rate analysis.
Checking detailed drawings for RCC manhole, Pipe bedding, Ventilating column, etc.
Master Planning of Plastic waste management facility centre including building planning (layout), fire safety, electrical, water supply, waste water generation, etc. other utilities planning.
Designing of Effluent Treatment Plant for Plastic Waste management facility.
Corresponding with Surat Municipal Corporations for Plan passing.
Corresponding with GPCB for NOC, CTE, CCA.
Corresponding with Factory Licence, Torrent Power Ltd. For H T Connection.
Preparation of Bill of Quantity for Civil works, Equipment, Electrical Items, Mechanical Items, etc.
Preparations of Loan Disbursement statement for finance.
Preparations of Bar-chart for establishing whole Plant as per time limit.
Documentation work for each and every items including civil, machinery, electrical, mechanical, etc.
Procurement of equipment, electrical transformers, mechanical items, civil materials, etc.
Detailed engineering for Extrusion process, etc.
Site visit and Survey work for existing sewerage network, water supply line, and other utilities, etc. Conducting Meeting with Executive Engineer/ Depute Engineer/ Assistant Engineer.
Designing of Municipal Landfill cell as per CPCB Guide lines for Municipal Solid waste.
Preparations of Bill of Quantity for Municipal Landfill cell and getting approved from competent authority.
Preparations of Detailed Project Report for Municipal Landfill cell.
Preparations of Tender documents.
Preparations of drawings for landfill cell and its all utilities such as Leachate collection system, Leachate well, Embankment sections, Effluent treatment plant.
Evaluation of contractor documents as per eligibility criteria up to the award of work order to contractor.
Site visit and Survey work for existing sewerage network, water supply line, and other utilities, etc. Conducting Meeting with Chairman / Director / Executive Engineer and making work progress presentation every 15 days/ during visit.
Preparation of Alternate route for sewerage system in IIT, Madras campus.
Designing of Sewerage Network Design after conducting topographical survey work for upgradation of existing sewerage network.
Design Calculations & getting approved (vetted) from competent authority of IIT, Madras campus.
Preparation of detailed Bill of Quantity (BOQ) & getting approved (vetted) from competent authority of IIT, Madras.
Preparation of L-Sections for Sewerage Network.
Preparation of Detailed Project Report for tendering purpose.
Checking drawings for Precast Manhole, RCC Manhole, Drop Manhole, L-Sections, Steel Details, Ventilating Column, Flushing drawing, Pipe bedding of different diameters drawing, etc.
Up-gradations of CETP including designing, electro-mechanical, SCADA system, the plant consists of RO, MEE. The plant is MBR based technology and fully automatic.
Checking drawings for GA drawings, Hydraulic Drawings, P & I drawings, Electrical details, Structural Details (SLD), etc.
Site visit / inspection / execution of work as per drawings and design.
Solutions given for installation of fixed type diffusers.
Hydraulic test / water run conducted after completion of installations of all electro-mechanical work equipment.
Documentation work / hand over after commissioning of Plant.
Preparation of feasibility report based on waste water analysis report and treatment carried out in laboratory.
Checking drawings for GA drawings, Hydraulic Drawings, P & I drawings, Electrical details, Structural Details (SLD), etc.
Site visit / inspection / execution of work as per drawings and design.
Checking Civil work/ levels/ hydraulic at site.
Hydraulic test / water run conducted after completion of installations all electro-mechanical work equipment.
Documentation work / hand over after commissioning of Plant.
Up-gradation of Plant of 125 KLD Pesticide industries.
Conducted survey work and soil investigation. Disturb and un-disturb samples bore done up to 10 m.
Preparation of feasibility report based on waste water analysis report and treatment carried out in laboratory.
The plant is convention type with Double Surface aeration system.
Checking drawings for GA drawings, Hydraulic Drawings, P & I drawings, Electrical details, Structural Details (SLD), etc.
Site visit / inspection / execution of work as per drawings and design.
Checking Civil work/ levels/ hydraulic at site.
Hydraulic test / water run conducted after completion of installations all electro-mechanical work equipment.
Documentation work / hand over after commissioning of Plant.
Suggestions / solution giving in filter press as filtration process of sludge was not proper and problem was identified and rectifications done.
Preparation of feasibility report based on waste water analysis report and treatment carried out in laboratory.
Conducted survey work and soil investigation. Disturb and un-disturb samples bore done up to 10 m.
Designing of Common Effluent Treatment Plant cum STP and getting approved by competent authority.
Checking drawings for GA drawings, Hydraulic Drawings, P & I drawings, Electrical details, Structural Details (SLD), etc.
Site visit / inspection / execution of work as per drawings and design.
Checking Civil work/ levels/ hydraulic at site.
Hydraulic test / water run conducted after completion of installations all electro-mechanical work equipment.
Documentation work / hand over after commissioning of Plant.
Preparation of feasibility report based on waste water analysis report and treatment carried out in laboratory.
Conducted survey work and soil investigation. Disturb and un-disturb samples bore done up to 10 m.
Designing of Effluent Treatment Plant cum STP and getting approved by competent authority.
Checking drawings for GA drawings, Hydraulic Drawings, P & I drawings, Electrical details, Structural Details (SLD), etc.
Site visit / inspection / execution of work as per drawings and design.
Checking Civil work/ levels/ hydraulic at site.
Hydraulic test / water run conducted after completion of installations all electro-mechanical work equipment.
Documentation work / hand over after commissioning of Plant.